Dörentrup

In Dörentrup, we have been operating three Vestas V162 turbines since last year.

Get in touch now

With their impressive 162-meter rotor diameter, each wind turbine achieves a rated output of 6,000 kW. This makes them among our largest turbines. In Dörentrup, we thus achieve a total projected annual generation of 36.4 million kWh.

Project information:

Start-up:

01.01.2024

Turbines:

3x Vestas V162

Total Capacity:

18,000 kW

Households Supplied*:

14,574 *2-person household, average consumption of 2,500 kWh per year, based on our turbines' annual forecasts
impressions
impressions

Project impressions

No pictures available

Conclusion & results

The Dörentrup wind farm is a true flagship project for community energy in OWL: It is characterized by high regional acceptance, solid financing, and transparent construction and operational structures. It serves as a model for how renewable energy can be shaped and supported by local community initiatives.

Educational Bursary

projects
OUR work

An insight into our projects

contact
contact us

Feel free to talk to us!

Icon 01
Location Canada
5 Graham St., Suite 201, Woodstock, ON, N4S 6J5, CA
About
Let's get in touch.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.