In Wölsickendorf, we operate two GE 5.3 turbines. With an impressive rotor diameter of 158 meters, these wind turbines each achieve a rated output of 5,300 kW. This makes them among our largest installations. In total, we project an annual generation of 32.27 million kWh in Wölsickendorf.





